Summary of investment context
France has a long-established tradition of mobilising private capital for the development and modernisation of national infrastructure, rooted in a distinctive public-private partnership culture stretching back over three centuries. The French system combines a mature concession model with regulated asset-based frameworks, direct government investment and targeted revenue support mechanisms; all designed to deliver long-term stability and predictable returns for private investors. Building on this tradition, recent legislative and regulatory reforms have sought to streamline administrative processes and enhance the competitiveness of French infrastructure for private capital. We set out below the key features of the French market, explaining how the various support mechanisms contribute to favourable risk allocation and predictable investment returns, and exploring recent and upcoming changes and the likely impact these will have on investment in the infrastructure sector.
Key Government policies and regulation attracting private capital
Economic Regulation
The concession model is the dominant framework for economic regulation of French infrastructure. Under French law, a concession is a contract through which a public authority entrusts a private operator with the execution of works or the management of a service, in exchange for the right to exploit the asset or service, with the concessionaire bearing operating risk1. The model extends across transport (motorways, airports, ports, tunnels), water and waste management, energy distribution networks and digital infrastructure. The model extends across transport (motorways, airports, ports, tunnels), water and waste management, energy distribution networks and digital infrastructure. At the core of each concession contract is the concept of economic equilibrium, maintained through three principal mechanisms: a tariff framework applicable to users; indexation formulae governing how tariffs evolve over time; and rebalancing clauses which can be triggered both in case of adverse events and favourable events (e.g. revenue sharing arrangements, limitation of the duration in case of outperformance).
Where the Regulated Asset Base ("RAB") model applies (principally in the energy sector) it operates in a manner analogous to UK practice. Article L. 341-2 of the French Energy Code provides that the cost of capital for electricity network operators is determined by reference to a regulated asset base multiplied by a weighted average cost of capital ("WACC"), calculated using a normative capital structure and benchmarks from comparable companies. The competent regulatory authorities set a target rate of return designed to make infrastructure attractive to private investors while remaining consistent with prevailing economic conditions, revised at each regulatory cycle of approximately four years.
Effectiveness: The concession model provides long-term revenue visibility and contractual certainty, with clearly defined tariff frameworks and indexation mechanisms reducing revenue volatility for investors. The RAB/WACC framework offers a transparent, formula-based return structure comparable to established regulatory models in peer jurisdictions, supporting access to lower-cost, investment-grade debt financing.
Challenges: The complexity of concession contracts and the need to negotiate economic equilibrium adjustments can create friction and legal uncertainty, particularly where tariff rebalancing is disputed. In relation to RAB model, the relatively infrequent regulatory cycle, approximately every four years, means that significant shifts in the economic environment between reviews can create periods of misalignment between allowed returns and market conditions.
Revenue Support and Tax Incentives
Two principal mechanisms apply to renewable energy generation in France. The power purchase obligation (obligation d'achat) requires Électricité de France ("EDF") and local distribution companies to purchase electricity generated from qualifying renewable sources at tariffs set by ministerial orders, providing a guaranteed, administered revenue floor and reducing exposure to wholesale price volatility.
The complément de rémunération — a contract for difference ("CfD") mechanism — may be granted under an open-window scheme or following competitive tender. Under a CfD, the producer sells electricity directly to the market; EDF then pays a premium calibrated, assessed ex post, to compensate for the difference between a reference tariff level and the market price achieved. This mechanism provides price stability and de-risks revenue streams, enabling more accurate financial modelling and supporting lower lending rates.
Effectiveness: The power purchase obligation offers maximum revenue certainty for qualifying projects. The CfD mechanism, by insulating producers from wholesale price volatility while preserving market participation, enables more accurate long-term financial modelling and reduces the cost of debt for supported projects.
Challenges: The retroactive alteration of CfD economics (in particular, the uncapping of negative premium repayments during periods of high electricity prices) has raised questions about the stability of these schemes as long-term contractual commitments. This is addressed in further detail in Section 4 below.
Government Investment
The French government provides significant direct funding support for infrastructure development through targeted grants, guarantees and equity participations. Subsidies may come from the French State, local authorities or specialised public institutions, it being specified that any support shall comply with EU state aid regulations. The French Environment and Energy Management Agency ("ADEME") provides funding for projects in industrial decarbonisation, renewable energy, hydrogen, the circular economy, sustainable mobility and urban development. European-level support is also available: the Connecting Europe Facility and the European Regional Development Fund (through which French regions manage approximately €9.1 billion) provide additional capital support for strategic infrastructure.
The French State also supports large-scale projects through guarantees and through direct equity participation via BpiFrance ("BPI") and the Caisse des Dépôts et Consignations ("CDC"), including minority equity stakes, co-investments alongside private investors, and dedicated infrastructure fund participations.
Effectiveness: State guarantees materially improve project bankability by absorbing credit risk. Direct equity participation by BPI and CDC signals government commitment, reduces perceived political risk and catalyses private co-investment.
Challenges: The availability of public support can be project-specific and dependent on government priorities, creating uncertainty for investors seeking replicable frameworks. Bureaucratic complexity and disbursement timelines represent a persistent friction for project sponsors.
Policy and Operational Regulation
The French administrative model provides strong institutional stability. However, certain procedures have been perceived as lengthy, prompting a series of recent legislative reforms.
The Acceleration of Renewable Energy Production Law (the "APER Law") introduced a presumption of major public interest for projects exceeding regulatory power thresholds, simplifying the granting of derogations related to protected species and reducing legal uncertainty. The Green Industry Law (Loi n° 2023-973, October 2023) simplified environmental authorisation procedures through parallel processing of consultations and introduced a Major National Interest Project status, with unified permitting and faster grid connection procedures. In May 2025, the Commission de Régulation de l'Énergie ("CRE") approved a fast-track connection process for sites with power requirements of between 400 MW and 1 GW pre-identified by the French State and the transmission system operator Réseau de Transport d'Électricité ("RTE").
Further reforms are anticipated. A report submitted to the Prime Minister in April 2026 proposes additional measures including: lowering financing costs via public funds; streamlining permitting by enabling the State to prepare permits for major projects; improving grid connection rules through harmonised tariffs; publishing grid capacity maps; and concentrating litigation relating to onshore wind, solar and battery storage within a single administrative court of appeal.
Effectiveness: These reforms collectively represent a meaningful acceleration of the administrative framework, reducing development-phase timeline risk and improving capital deployment velocity for private investors.
Challenges: Administrative reform in France is incremental and the gap between legislative intent and practical implementation can be significant. Litigation risk in the consenting process remains a material concern, and until the proposed concentration of appeals is enacted, legal uncertainty continues to extend project timelines.
Partnership Contracts and Concessions
Two principal forms of public contract, concessions and partnership contracts (contrats de partenariat), mobilise private capital for the construction and long-term management of infrastructure. Under a concession, operational and commercial risks are transferred to the private operator, who recovers investment through exploitation rights, tariffs or fees paid by users. Regulatory oversight reinforces transparency and stability: the French Transport Regulatory Authority (Autorité de régulation des transports) publishes a public report every five years on the overall economics of concession agreements and monitors internal rates of return annually.
Under a partnership contract, the private operator is entrusted with a comprehensive mission, construction, financing, management and maintenance, receiving periodic payments from the public authority. Partnership contracts are subject to strict conditions including a preliminary assessment confirming the arrangement offers a more favourable outcome than alternative structures, budgetary sustainability studies, and minimum project size thresholds of typically €5–10 million. Historically used for major projects, including the LGV Bretagne-Pays de la Loire and the Balard Ministry of Defence complex — partnership contracts have declined sharply owing to concerns about complexity, economic efficiency and the high cost of private financing.
Effectiveness: The concession model provides a legally robust framework with clearly defined risk allocation, tariff structures and regulatory oversight. Long contractual durations support investor certainty and the ability to raise long-term, project-financed debt.
Challenges: Partnership contracts have fallen significantly out of favour. Investors seeking availability-based, government-payment structures have fewer well-established frameworks to rely upon, and the strict conditions attached to partnership contracts have materially limited their use.
Infrastructure pipeline
Pipeline transparency in France is generally strong, though it varies by sector and project size. For the energy sector, the principal reference point is the multiannual energy programme (programmation pluriannuelle de l'énergie, "PPE"), which sets quantified trajectories by energy sub-sector over two consecutive five-year periods. The third version (PPE 3) was published by decree on 12 February 2026, setting objectives across: reducing fossil fuel consumption to a target of 1,440 TWh; reaffirming the central role of nuclear energy; ensuring electricity system security; and integrating system security within the broader low-carbon transition.
In the motorway sector, pipeline visibility is enhanced through the structured management of concession lifecycles. The Ministry of Transport launched maintenance and investment programmes in March 2025 in advance of the end of existing concessions, preparing the ground for the gradual re-tendering of historic concessions expected between 2031 and 2036.
Institutional support is provided by FinInfra, a French Treasury advisory body for the legal and financial structuring of infrastructure projects requiring private financing, and the Conseil d'Orientation des Infrastructures, which published a long-term strategy covering 2023 to 2042 for the financing of transport infrastructure.
Notwithstanding these strengths, these plans are essentially indicative and may be subject to change, particularly in the event of a political shift.
Risk allocation and predictability of returns
The support mechanisms described above improve risk allocation and return predictability in distinct ways:
Concessions and partnership contracts: Long contractual durations, clearly defined tariff frameworks, indexation mechanisms and economic equilibrium protections provide long-term revenue visibility, supporting the raising of project-financed debt.
RAB/WACC framework: In the energy sector, the RAB/WACC model provides a formula-based, transparent return structure, reducing regulatory discretion and enabling investors to model returns with a high degree of confidence over each four-year regulatory cycle.
Revenue support mechanisms: The power purchase obligation and CfD mechanism materially reduce revenue risk for renewable energy projects, supporting debt sizing, reducing the overall cost of capital and improving risk-adjusted returns for equity investors.
Government guarantees and co-investment: State guarantees reduce credit risk and improve bankability for private co-investors; direct equity participation by BPI and CDC signals public commitment and catalyses private capital.
Regulatory reform: Recent reforms, such as the APER Law, Green Industry Law and CRE fast-track process reduce development-phase timeline risk by streamlining the administrative and consenting process, improving capital deployment velocity.
Recent legal and regulatory change
Retroactive measures are uncommon under French law, which places particular emphasis on the right to maintain legally executed contracts and the principle of legal certainty. Such principles may be set aside only for reasons of overriding public interest and subject to the principle of proportionality. Notwithstanding this, recent developments in the energy sector have seen legislative changes affecting renewable energy support schemes with retroactive effect, giving rise to litigation before both the Constitutional Council and the Conseil d'État.
Retroactive uncapping of negative CfD premiums
The most significant recent development affecting investor confidence is the retroactive modification of CfD contract economics in response to elevated electricity prices. Under the CfD mechanism, when electricity prices rise above a reference tariff, renewable energy producers must repay a negative premium to EDF. Originally, this repayment was capped. In 2022, the French State introduced a partial uncapping applied retroactively from 1 January 2022 (through Article 38 of the 2022 Finance Law). The Constitutional Council, in a decision of 26 October 2023, confirmed that the State may retroactively require repayment of premiums exceeding a reasonable return, but declared Article 38 unconstitutional on procedural grounds. The government subsequently adopted a full uncapping provision in the 2024 Finance Law. In a decision of 24 January 2025, the Constitutional Council again ruled this unconstitutional: while the legislature may retroactively remove the premium cap during periods of high electricity prices, it cannot do so without guaranteeing producers a reasonable return on invested capital, accounting for operational risks across the remaining contract term.
These decisions confirm that public authorities may retroactively alter the economics of long-term contracts for a sufficient public interest reason, but must ensure the impact is proportionate — preserving a portion of investors' legitimate contractual expectations beyond mere minimum profitability.
Changes in purchase tariffs
The 2021 Finance Law provided for a reduction in the purchase price of electricity produced by photovoltaic or thermodynamic installations with peak capacity above 250 kW under 2006 and 2010 ministerial order contracts. The Constitutional Council ruled in December 2020 that while the measure affected legally concluded contracts, it was not disproportionate given public interest, fair compensation and a case-by-case safeguard mechanism. A subsequent decree established a review procedure (the "safeguard clause") allowing adjustment where application would threaten economic viability. The Conseil d'État confirmed the legality of this procedure in January 2023 but annulled the implementing ministerial order on the grounds that the underlying tariff schemes had not been properly notified to the European Commission under State aid rules. The French government subsequently announced it would not implement the tariff revision mechanism for installations benefiting from the 2006 and 2010 tariff regimes.
New provisions introduced in the 2026 draft finance bill illustrate the French government’s increasingly nuanced approach to solar support. Article 69 proposes to remove the current cap on negative premiums in certain complément de rémunération (CfD) contracts and to adjust tariffs for some PV producers. In parallel, the draft budget plans to double the Flat-rate Tax on Network Businesses (Imposition Forfaitaire sur les Entreprises de Réseaux “IFER”) tax for PV plants ≥100 kW commissioned before 1 January 2021 (from ≈ €8.51/kW to ≈ €16.05/kW), while maintaining a significantly lower rate (≈ €3.54/kW) for newer plants.
In addition, the CRE continues to reduce support levels for smaller installations. In March 2026, feed-in tariffs for PV systems up to 100 kW were lowered for the April–July 2026 period, with rates falling to €0.0805/kWh (9–36 kW) and €0.070/kWh (36–100 kW), and surplus compensation reduced to €0.0473/kWh.
These measures reflect a deliberate policy shift: the government is seeking to contain the cost of historical support schemes and discourage pure grid-export models, while attempting to preserve incentives for new, better-integrated solar projects that incorporate self-consumption and storage.
Summary of regulatory environment
Investors in French infrastructure face a mature, increasingly rigorous regulatory environment. The actively enforced FDI regime covers sensitive sectors like energy, transport, and raw materials, though greenfield investments remain exempt. While outright prohibitions are rare, 54% of 2024 transactions required commitments to protect economic sovereignty, with further legislative tightening expected notably for data centres and AI. For merger control, the French Competition Authority strictly applies competition-based economic analysis, however has recently shown it may be open to behavioural commitments in certain transactions. It streamlines non-problematic deals but heightens scrutiny on “killer acquisitions”. Finally, independent sectoral regulators (i.e. CRE, ART, ARCEP) ensure market stability and drive long-term public policy. They actively engage in rail liberalisation and 5G deployment, supported by a robust appeals process.
How burdensome is the FDI regime in this jurisdiction, and are there any notable trends relating specifically to infrastructure investment?
The French foreign investment regime (FFIR) is a mandatory suspensory regime that is robust and actively enforced. Reviews are conducted by the Ministry of the Economy (MoE) which may (i) approve a transaction unconditionally, (ii) approve it subject to commitments, or (iii) prohibit it – although prohibitions remain very rare, particularly in the infrastructure sector.
Authorisation is required under the regime where a non-French investor acquires control of an entity or of all or part of a branch of activity within a French entity engaged in sensitive activities or where a non non-EU or non-EEA investor crosses, directly or indirectly, the 25% voting rights threshold (reduced to 10% for listed companies) in a French entity carrying out such sensitive activities.2 Notably, greenfield investments that create new capacity remain outside of the regime’s scope, making France an attractive jurisdiction from an FDI perspective, particularly for the development of new infrastructure.
The regime casts a wide net over sensitive sectors, capturing almost all infrastructure sectors,3 including energy production and storage, water supply and treatment, transport management and manufacturing, and electronic communications. The scope also extends to any activities deemed essential to the continuity of critical infrastructure. Recent expansions have broadened the regime to include the extraction and processing of critical raw materials.
There has been a steady increase in the number of transactions reviewed under the regime (327 in 2024).4 Infrastructure – specifically investments in essential infrastructure, assets or services, including those aimed essential to the integrity and continuity of energy, water, or transport networks accounted for 37% of authorised transactions in 2024.5 The MoE has also demonstrated its intention to use this regime to protect France’s economic sovereignty, as illustrated by the fact that a significant proportion of transactions falling within the scope of review are approved subject to commitments (54% in 2024).6
The prevailing trend points towards a continuous strengthening of the regime. While the current framework is now well established and generally provides a satisfactory level of predictability supporting transaction feasibility for investors, several recent parliamentary reports and legislative proposals advocate a significant tightening of the regime.7 Proposed measures include an extension of the scope of the regime (notably to better cover data centres and AI), strengthening of commitments (including imposition of proxy boards in more cases), and enhanced monitoring and enforcement of commitments. A parliamentary report on the scope and effectiveness of the current regime is expected to be published in June 2026.
What is the latest public policy direction for merger control in this jurisdiction, particularly regarding any trends relevant for infrastructure investment?
The French merger control regime is a mandatory, pre-closing regime overseen by an independent administrative regulator, the French Competition Authority (FCA). The legal framework for merger control in France is mature and stable. While there is no specific procedural track for infrastructure transactions, these are reviewed by the FCA under the standard merger control procedure, in close coordination with the relevant sectoral regulator. Nevertheless, the FCA’s enforcement policy reflects several general orientations that are particularly relevant to infrastructure investments:
Simplification of the review of non‑problematic transactions:
the FCA has introduced a streamlined and expedited review process to reduce the administrative burden and accelerate Phase 1 decisions for transactions that do not raise competition concerns. This allows the FCA to focus its resources on potentially problematic transactions, while facilitating investments without horizontal overlaps or vertical issues in France, notably in capital‑intensive infrastructure sectors such as energy, transport and water.
Increased scrutiny of below‑threshold transactions: while the notification thresholds are in the process of being increased, France is simultaneously following a broader European trend toward closer scrutiny of small‑scale transactions. The FCA is exploring tools to assess certain below‑threshold acquisitions where they may give rise to competition concerns,8 particularly in innovative or strategic sectors (so-called “killer acquisitions”). This approach may affect infrastructure‑related activities in areas such as (i) energy storage; (ii) smart micro‑grids; and (iii) sensors, data and digital technologies applied to public networks.
A rigorous and technical analytical approach: the FCA maintains a rigorous, technical focus on in-depth economic analysis. Unlike some peers, the regulator does not formally incorporate industrial policy considerations, such as the creation of "national champions," into its assessments. This strict protection of competitive market structures applies equally to infrastructure deals, as highlighted in the recent prohibition decision in TF1/M6.9 This case emphasises the FCA’s stringent approach to the protection of the competitive market structure.
Growing consideration of non‑price effects:
the FCA pays particular attention to innovation and third‑party access to essential infrastructure (e.g. energy networks, telecommunications networks, etc.) on fair, transparent and non‑discriminatory terms. The FCA has shown it may be open to behavioural commitments, as demonstrated by the recent Vossloh/Sateba decision.10 Moreover, long‑term considerations, such as security of supply and energy transition objectives, may in theory be taken into account when assessing efficiency gains.
In sum, the French merger control regime remains firmly grounded in a rigorous, competition‑based analysis. For infrastructure investors, this framework offers a high degree of legal predictability. The prevailing trend reflects a dual approach: on the one hand, a simplification and streamlining of review for transactions that do not raise competition concerns; on the other hand, a more sophisticated and in‑depth assessment where an investment may adversely affect competition, incorporating non‑price considerations and long‑term effects on the market.
What is the record of sector-specific regulators overseeing infrastructure sectors in this jurisdiction and are there any key or upcoming developments to highlight?
France’s primary infrastructure sectors are overseen by independent administrative regulators, including the Energy Regulatory Commission (CRE), the Electronic Communications, Postal and Press Distribution Regulatory Authority (ARCEP), and the Transport Regulatory Authority (ART). Their political independence is enshrined in law, underpinning a strong reputation for technical expertise, regulatory stability and predictability. These regulators are tasked with ensuring functional markets, guaranteeing non‑discriminatory access to networks, and setting access tariffs and conditions for regulated infrastructure.
Current developments are driven by long-term public policy objectives with regulators acting as the technical guarantors of effective implementation, while safeguarding both consumer interests and investor confidence:
Energy transition and network investment: France’s EUR 54 billion (GBP 46.3 billion) 2030 strategy places increasing pressure on the CRE to accelerate decarbonisation, modernise electricity and gas infrastructure, and support emerging sectors (i.e. hydrogen, batteries, low‑carbon mobility).11 The CRE plays a central role in France’s energy transition policy and its decisions are designed to send appropriate investment signals to support the large-scale integration of renewables and foster emerging technologies like hydrogen, batteries, and low-carbon mobility.
Competition in passenger rail transport: The ART plays a key role in the gradual liberalisation of passenger rail transport. It is notably responsible for ensuring fair and equitable access to the rail network for new entrants alongside the incumbent operator12.
Roll‑out of fibre and 5G networks: ARCEP is recognised for its proactive regulatory approach, which has enabled the rapid deployment of fibre‑optic networks across France. It continues to regulate the sector to ensure quality of service and to prepare the competitive framework for next‑generation networks, including 5G and beyond.
In France, decisions of sectoral regulators may be challenged before the French supreme administrative court.13 The court can review the legality and manifest error of assessment of the regulators, thereby ensuring a robust level of legal certainty for investors in regulated sectors.
- Mandatory?
- Yes
- Voluntary?
- No
- Review period(s)
Once filed (the MoE confirm completeness retroactively as of the notification date):
Phase 1: 30-working days14
Phase 2: additional 45 working days
- Number of notifications
- 32715
- Non-notified deals called-in
- N/A
- In-depth investigations
- N/A16
- Remedies cases
- 9917
- Blocked cases
- N/A18
- Abandoned cases
- 219
- Mandatory?
- Yes
- Voluntary?
- No
- Review period(s)
Once filed (the FCA confirm completeness retroactively as of the notification date):
Phase 1: 25 working days20
Phase 2: 65 days21
- Number of notifications
- 29522
- Non-notified deals called-in
- N/A
- In-depth investigations
- 023
- Remedies cases
- 824
- Blocked cases
- 025
- Abandoned cases
- 026
Endnotes
Under French law, a concession is a contract through which a public authority entrusts a private operator with the execution of works or the management of a service, in exchange for the right to exploit the asset or service, with the concessionaire bearing an operating risk. The French concession model extends across diverse infrastructure and service sectors↩︎
The crossing of the 25% voting rights threshold (reduced to 10% for listed companies) also triggers a filing obligation where the investor has non-EU or non-EEA nationality.↩︎
See Article R.151-3 of the French Monetary and Financial Code.↩︎
See page 5 of the Annual Report 2025 of the MoE.↩︎
See page 9 of the Annual Report 2025 of the MoE.↩︎
See page 6 of the Annual Report 2025 of the MoE.↩︎
See for example draft bill no. 2600 introduced by MP Philippe Juvin.↩︎
See the press release of the FCA regarding the consultation on the introduction of a screening mechanism for below threshold transactions.↩︎
See the press release of the FCA regarding the decision by Bouygues to withdraw its proposed acquisition of M6.↩︎
See case the FCA’s decision 25-DCC-220 of 29 September 2025 clearing the acquisition of the Sateba group by Vossloh, subject to a commitment.↩︎
See the main objectives of the France 2030 plan.↩︎
See Article L.2133-1 of the French Transport Code.↩︎
See Article R. 311-1 of the French administrative justice Code.↩︎
Subject to potential RFIs that stops the clocks.↩︎
See paragraph 2 and figure 1, page 7 of the Annual Report 2025 of the French Ministry of Economy (MoE).↩︎
This information is not made public by the MoE. However, the Annual Report 2025 of the MoE confirms that 54% of the investments that were cleared involved remedies, meaning that at least 99 investments involved an in-depth investigation (Phase 2).↩︎
See exec summary paragraph 2, page 5 of the Annual Report 2025 of the MoE.↩︎
The Annual Report 2025 of the MoE does not contain specific information regarding blocked cases in 2024. However, it indicates that between 2022 and 2024, 6 cases have been blocked by the MoE (see page 8, paragraph 2 of the Report).↩︎
See page 6 of the Annual Report 2025 of the MoE.↩︎
This period can be extended up to 30 additional working days and RFIs may stop the clock.↩︎
This period can be extended up to 40 additional working days and RFIs may stop the clock.↩︎
See page 14 of the Annual Report 2024 of the French Competition Authority (FCA).↩︎
Based on the data publicly available on the FCA’s case registry.↩︎
See page 8 of the Annual Report 2024 of the FCA.↩︎
Based on the data publicly available on the FCA’s case registry.↩︎
Based on the data publicly available on the FCA’s case registry.↩︎