Australia
Renewable Energy Zone build-out, the CEFC and ARENA, and FIRB screening applied case by case.
Summary of investment context
Australia offers one of the most mature and well-developed regulatory environments for private infrastructure investment globally, underpinned by a sophisticated suite of government-backed support mechanisms spanning economic regulation, revenue support, direct public investment and public-private partnership frameworks. While the framework is broadly well-regarded by international investors, its complexity, spanning Commonwealth and state-level regulatory regimes across multiple sectors, requires expertise to navigate effectively. We set out below the key features of the Australian market, explaining how the various support mechanisms contribute to favourable risk allocation and predictable investment returns, and exploring recent and upcoming changes and the impact these are likely to have on investment in the infrastructure sector.
Key Government policies and regulation attracting private capital
Economic Regulation
The Australian Energy Regulator (the "AER") administers the national regulatory framework for electricity and gas networks under the National Electricity Law and National Gas Law, setting allowable revenues based on a Regulated Asset Base ("RAB") methodology incorporating a regulated rate of return, calibrated to the weighted average cost of capital ("WACC"), reviewed through five-year regulatory determinations. The Australian Competition and Consumer Commission (the "ACCC") oversees access and pricing in telecommunications and certain other nationally significant infrastructure, while state-based regulators, including IPART in New South Wales and the ESC in Victoria, regulate water and certain transport assets.
The RAB model is well-understood and broadly bankable, though concerns persist around the AER's appetite to set returns that adequately compensate for construction-phase and energy transition risks. The AER's Rate of Return Instrument — which sets key WACC parameters for energy network businesses — does not distinguish between required returns on existing assets and new capital projects, and the requirement for network businesses to seek regulatory approval for major capital investments introduces timing and approval risk, particularly for large-scale transmission projects.
The Integrated System Plan (ISP), published by AEMO, is the key long-term transmission planning instrument and has elevated investor confidence in the strategic logic underpinning network investment. Projects identified in the ISP as "actionable" in the ISP can go through a streamlined form of the Regulatory Investment Test for Transmission (RIT-T). Once the RIT-T has been passed, this provides a pathway to RAB inclusion and therefore revenue certainty.
In transport, economic regulation takes diverse forms. Toll roads typically operate under concession agreements with state governments, with revenue risk borne by the concessionaire (demand-risk models) or shared through availability-payment structures. Airports are subject to a "light-handed" monitoring regime administered by the ACCC, which has been broadly welcomed by investors as providing pricing flexibility while maintaining regulatory oversight. Some ports are regulated at the state level, with varying approaches - Victoria, for example, applies a price-monitoring regime, while other states rely on access undertakings or bespoke regulatory instruments (some ports are not subject to any form of economic regulation). Rail access regulation involves a combination of national and state access regimes.
Effectiveness: The RAB model enables network businesses to secure lower-cost, investment-grade debt financing, reducing the overall WACC and providing long-term revenue visibility for investors. The ISP provides a twenty-year investment roadmap that has been instrumental in anchoring procurement and investment frameworks, including the Capacity Investment Scheme and state-based Renewable Energy Zone programmes.
Challenges: The AER's Rate of Return Instrument has been a persistent source of tension, with investors consistently arguing that allowed returns inadequately compensate for cost of capital over the life of new capital commitments. Delivery risk — including planning delays, supply chain constraints and community opposition — remains the binding constraint on Australian infrastructure investment and is being priced accordingly by the market.
Revenue Support and Tax Incentives
The Commonwealth Government's Capacity Investment Scheme (the "CIS") is the principal federal revenue support mechanism for dispatchable and renewable energy generation. Operating through competitive tender processes, the CIS underwrites a floor price for selected projects — materially de-risking merchant energy revenue and enabling sponsors and lenders to base financial models on a long-term, contracted revenue stream. The CIS is generally structured to allow investors to retain upside above the strike price, preserving commercial incentives while protecting the downside.
The Australian Renewable Energy Agency ("ARENA") provides grant funding for innovative and early-stage clean energy projects, while the Clean Energy Finance Corporation (the "CEFC") provides concessional finance, equity co-investment and debt financing across a range of clean energy and sustainability-linked infrastructure. State-based revenue support mechanisms also operate in certain jurisdictions — in New South Wales, for example, Long-Term Energy Service Agreements ("LTESAs") are available for qualifying projects under the Electricity Infrastructure Investment Safeguard scheme.
While the overall tax incentive landscape is less comprehensive than jurisdictions such as the US or Canada, investors generally view the Australian framework as commercially workable when layered with CIS or concessional finance support.
Effectiveness: The CIS directly addresses the most significant risk for renewable energy and storage investors — merchant revenue uncertainty — by underwriting a floor price and improving debt capacity through higher gearing ratios and reduced equity return requirements, materially improving project Internal Rates of Return ("IRR") on a risk-adjusted basis.
Challenges: The CIS has involved iterative changes to auction parameters, eligibility criteria and contract terms across successive tender rounds. While understandable given the novelty of the mechanism, this has made it more difficult for investors to develop standardised financial models and has required ongoing adaptation of bidding strategies — a form of in-period policy adjustment that creates its own uncertainty.
Government Investment
Each of the Commonwealth and state governments is a significant direct investor in infrastructure, predominantly through budget-funded capital expenditure in transport, health, education and water. In the energy sector, direct government investment is deployed through specialist vehicles, such as the CEFC,and bespoke initiatives designed to catalyse first-of-a-kind projects and mobilise private balance sheets, typically structured to avoid crowding out private lenders and co-investors. Several material Commonwealth investment programmes complement this framework. The National Reconstruction Fund (a A$15 billion fund investing in manufacturing across seven priority areas) and the Housing Australia Future Fund (a A$10 billion fund supporting social and affordable housing) together represent significant public capital deployment alongside private investment. Rewiring the Nation, a A$20 billion federal commitment to accelerate transmission build-out, is directly relevant to private investors in energy infrastructure. The Northern Australia Infrastructure Facility provides concessional loans for projects in northern Australia, including ports, roads, water and digital infrastructure.
Government guarantees are less common in the Australian context than in some comparable jurisdictions, though the New South Wales and Victorian governments have provided credit support, revenue underwriting and land access facilitation for Renewable Energy Zone infrastructure.
Although asset recycling programs have expired, governments are looking at ways to optimise their balance sheets and improve productivity.
Effectiveness: Public investment vehicles and programmes — particularly the CEFC's concessional finance and co-investment capability — have proven effective at catalysing private capital for first-of-a-kind and early-stage projects, reducing financing costs and improving overall project economics for private co-investors.
Challenges: Government investment priorities can shift between administrations — creating uncertainty for investors.
Policy and Operational Regulation
Environmental and planning approvals in Australia operate under both Commonwealth legislation and state and territory planning laws, creating a dual-track approvals process that materially affects development timelines. The Commonwealth Government's proposed reforms to the Environment Protection and Biodiversity Conservation Act 1999 (the "EPBC Act"), including the establishment of a new federal Environment Protection Agency, are intended to streamline environmental approvals and reduce duplication. The final shape and timing of these reforms remain uncertain, creating a sustained period of policy uncertainty for infrastructure developers dependent on federal environmental approvals.
At the state level, planning reforms have been introduced in New South Wales, Victoria, Queensland and Western Australia to streamline approvals for priority infrastructure, including dedicated fast-track pathways for state-significant infrastructure and renewable energy projects.
In the energy sector, AEMO’s ISP provides a strategic blueprint for the development of the National Electricity Market (NEM), including the identification of priority transmission projects and Renewable Energy Zones (REZs). The ISP framework has improved coordination and strategic direction, and several states (notably New South Wales and Queensland) have established dedicated REZ frameworks with associated access schemes and planning pathways. However, while it provides an overall blueprint for NEM development, the ISP does not address jurisdictional planning requirements, land access and other matters that can be critical for project deliverability.
The Australian Government's recently published "Expectations of Data Centres and AI Infrastructure Developers" (the "Expectations Guidance") represents a significant policy signal for the digital infrastructure sector. While not yet legally binding, the guidance creates a de facto compliance framework for hyperscale data centre and AI infrastructure developers seeking planning approvals, grid connections or government support. Investors in this sector should treat the guidance as an emerging risk allocation consideration — particularly in relation to energy procurement obligations, sustainability reporting and planning conditions — while recognising that it also provides a degree of forward visibility regarding government priorities that sophisticated investors may welcome as a basis for long-term planning.
Effectiveness: State-level fast-track pathways and the ISP framework have improved coordination and strategic direction for energy infrastructure, providing meaningful forward visibility of investment needs.
Challenges: The dual Commonwealth-state approvals process remains a primary source of timeline risk for greenfield infrastructure projects. The EPBC Act reform process has created sustained uncertainty without yet delivering the streamlining it promises, and the Expectations Guidance introduces mid-stream compliance considerations for digital infrastructure investors who may have committed capital under different assumptions.
Security of Critical Infrastructure and Merger Control
Australia's Security of Critical Infrastructure Act 2018 (Cth) (SOCI Act) imposes security related obligations on owners and operators of critical infrastructure assets across eleven defined sectors, including energy, water, transport, communications, and data storage and processing. The expanding scope of the SOCI Act, including its extension to data centres and cloud services, is a significant consideration for investors in digital infrastructure and adds to the regulatory compliance burden for asset owners.
The ACCC plays a role in merger review for infrastructure acquisitions and, increasingly, in market structure oversight in digital infrastructure markets. The merger clearance regime has recently been significantly overhauled, introducing mandatory notification requirements for transactions meeting certain thresholds.
Infrastructure pipeline
Australia benefits from a relatively transparent infrastructure pipeline by global standards, underpinned by institutional frameworks at both the Commonwealth and state levels.
Infrastructure Australia released a reformed 2026 Infrastructure Priority List in March 2026, with a more targeted, evidence-based and strategically disciplined pipeline tool, identifying 68 high-priority proposals for investment over the next decade across five pillars: high-productivity freight networks, ports capacity and connectivity, high-capacity urban transport, secure and sustainable water, and delivering net zero and a clean energy economy.
Infrastructure Partnerships Australia maintains the Australian New Zealand Infrastructure Pipeline (ANZIP), which tracks major projects (including PPPs and investable opportunities) of A$100 million and above, providing a consolidated, market-facing view of infrastructure activity across jurisdictions.
State infrastructure bodies (such as Infrastructure NSW, Infrastructure Victoria, and Building Queensland) maintain their own priority lists and forward pipelines, and state treasuries publish annual budget papers and capital statements that provide visibility over committed and planned infrastructure expenditure, typically over a four-year forward estimates period.
In the energy sector, AEMO’s Integrated System Plan (ISP) provides a twenty-year investment roadmap for the National Electricity Market, identifying priority transmission projects, Renewable Energy Zones, and the optimal mix of generation and storage investments required to support the energy transition. It is widely regarded as a valuable planning tool that gives investors forward visibility into the trajectory of energy infrastructure investment, and has been instrumental in anchoring procurement and investment frameworks such as the CIS and state-based REZ programs.
Separate to the ISP, some State Governments have identified priority projects within their own jurisdictions. For example, the New South Wales Government identifies REZ projects and other priority infrastructure projects as part of its Electricity Infrastructure Roadmap. The Commonwealth Government also released the inaugural National Renewable Energy Priority List in March 2025, identifying 56 priority renewable energy projects that will receive targeted support to streamline regulatory planning and environmental approval processes. However, the list does not include funding commitments or delivery timelines, limiting its utility for investors seeking to plan and deploy capital with confidence.
There is a gap in pipeline transparency for digital infrastructure with no national strategic plan but the Expectations Guidance introduces a partial disclosure regime, requiring developers to engage with government on energy and grid integration plans, which may, over time, contribute to a more structured pipeline disclosure framework for AI and data infrastructure.
Despite these strengths, several factors constrain the transparency and accessibility of the Australian pipeline from an investor perspective. Transparency is most constrained in the early-stage project development phase. Foreign investors consistently identify the complexity of navigating multiple state and federal pipelines, without a single consolidated access point, as a structural friction point. Pipeline visibility is strongest in sectors with established regulatory or procurement frameworks (such as energy networks, toll roads, and social PPPs) and weakest in emerging sectors (such as digital infrastructure, water recycling, and social housing) where procurement models and government commitment are still being developed.
Effectiveness: Australia's institutional frameworks provide a solid foundation for pipeline transparency, particularly in energy and transport.
Challenges: The absence of a unified national pipeline, inconsistent progression from planning to procurement, and gaps in emerging sectors like digital infrastructure, mean that investors must invest significant effort in navigating and synthesising fragmented information across jurisdictions.
Risk allocation and predictability of returns
The support mechanisms described above improve risk allocation and return predictability in distinct ways:
RAB model: For transmission and distribution network assets, RAB inclusion effectively converts construction-phase capital expenditure into a regulated revenue stream with a benchmark rate of return, protecting investors from volume and demand risk. Revenue allowances reset every five years to reflect movements in costs, including the benchmark cost of capital — making regulated network assets highly attractive to institutional investors seeking stable, long-duration returns.
CIS and revenue support: The CIS directly addresses merchant revenue uncertainty — the most significant risk for renewable energy and storage investors — by underwriting a floor price and enabling financial models based on long-term, contracted revenue rather than forward electricity price curves. This improves debt capacity, reduces equity return requirements and materially improves project IRR on a risk-adjusted basis.
Government investment: CEFC concessional finance and Commonwealth co-investment programmes reduce financing costs and improve overall project economics for private co-investors, particularly for first-of-a-kind or early-stage technologies where commercial viability is not yet fully established.
PPP structures: Availability-payment PPP contracts eliminate demand risk entirely, allocating construction and lifecycle risk to the private sector under well-understood contractual frameworks — making them highly bankable and attractive to long-term institutional capital. Australia's depth of experience with the PPP model, and its established secondary market for operational assets, provide meaningful liquidity and exit visibility for institutional capital.
Digital infrastructure: Data centres and hyperscale facilities typically operate under long-term offtake agreements with creditworthy counterparties, providing strong revenue certainty. However, energy procurement and grid connection risk is significant in the current constrained grid environment. Investors who proactively embed the Expectations Guidance into project design may find it easier to access government planning facilitation, CEFC concessional finance and ESG-aligned debt capital markets funding.
Across sectors, Australia's support mechanisms are effective at de-risking the revenue side of the investment equation, but are less effective at addressing delivery risk — including planning and approvals delays, supply chain constraints, community opposition and workforce shortages. These factors can materially erode returns and introduce timeline uncertainty that is difficult to hedge, particularly for greenfield projects, and investors are increasingly pricing delivery risk as the binding constraint on Australian infrastructure investment.
Recent legal and regulatory change
Retroactive or Quasi-Retroactive Change
Australia's regulatory frameworks are generally stable and rules-based. However, there are instances where regulatory resets have effectively adjusted the returns available to existing investors on a prospective basis in ways that were not anticipated at the time of investment.
AER Rate of Return — parameter revision
Changes introduced through successive iterations of the AER's Rate of Return Instrument have significantly revised the equity beta and market risk premium parameters used to calculate regulated returns — with the effect of reducing allowed returns for networks that had committed capital under more favourable assumptions. While the changes were technically prospective, they affected investors who had made acquisitions pricing in returns that the regulatory framework subsequently declined to support. The AER's consultation processes, while extensive, do not always accommodate the legitimate expectations of equity investors who acquired assets at prices reflecting prior regulatory signals — a dynamic that closely parallels the "soft retrospective risk" identified in other regulated infrastructure markets globally.
Changes During a Period of Expected Stability
In the energy sector, the market rules are subject to ongoing review and change. One example of this is the design and implementation of the CIS, which has involved iterative changes to auction parameters, eligibility criteria, and contract terms across successive tender rounds. While this iterative approach is understandable given the novelty of the mechanism, it has made it more difficult for investors to develop standardised financial models and has required ongoing adaptation of bidding strategies. Similarly, changes to the design of state-based Renewable Energy Zone frameworks, including access fee structures and curtailment risk allocation, have been introduced during periods in which investors were already progressing development activities in reliance on earlier policy settings.
The ongoing EPBC Act reform process has created a sustained period of uncertainty for infrastructure developers dependent on federal environmental approvals. While the reforms are intended to improve the efficiency and effectiveness of environmental regulation, the transitional arrangements and the scope of the new regulatory framework remain unclear, creating a period of policy uncertainty that affects investment decisions for greenfield infrastructure across energy, ports, transport and data centres.
The government's introduction of mandatory climate-related financial disclosure requirements (which commenced for large entities in 2025) and the expanding obligations under the Expectations Guidance for data centres and AI infrastructure developers are further examples of regulatory content being added to sectors that previously operated in a relatively lightly regulated environment. While neither constitutes a retroactive change, both represent mid-stream imposition of compliance obligations upon investors who may have committed capital based on different assumptions.
On 10 April 2026, the Federal Government released two exposure drafts proposing a significant overhaul of Australia's foreign resident capital gains tax (CGT) regime. The changes broaden the scope of taxable Australian real property (TARP), reform the principal asset test (PAT), introduce new compliance obligations (with some changes applying retrospectively from 2006) and provide a time-limited 50% CGT discount for foreign residents investing in Australian renewable energy assets. The proposed amendments, which have been longed talked about, significantly expand the CGT net for foreign investors through a broadened definition of real property, the override of state and territory severance provisions, retrospective application to 2006, an enhanced PAT and new compliance obligations. The companion renewable energy discount provides some relief but is narrowly targeted and time limited. Foreign investors in Australian land, infrastructure and energy assets will need to carefully assess their exposure as a matter of priority.
Summary of regulatory environment
Investors in Australian infrastructure face a triple-layered regulatory environment, including a recently introduced mandatory merger control regime. The foreign investment regime facilitates rigorous "national security" scrutiny of certain critical assets in sectors such as energy, water, and data infrastructure with no financial thresholds. Simultaneously – as of January 2026 - the Australian Competition and Consumer Commission (ACCC) has moved to a mandatory and suspensory merger control regime, replacing its previous voluntary approach with a strict notification requirement to safeguard competition. Supporting these layers is a maturing sector-specific landscape; here, specialised bodies like the national energy regulator provide expert oversight with the national regulatory framework supplemented with state-based rules for utilities.
How burdensome is the FDI regime in this jurisdiction, and are there any notable trends relating specifically to infrastructure investment?
Australia generally welcomes foreign investment. Australia’s Foreign Investment Review Board (FIRB) screens transactions taking into account acquirer, target and investment structure to determine whether a particular proposal runs contrary to the national interest or, in certain circumstances, national security only.1 In general, the FDI regime requires approval for acquisitions of an interest of 20% or more, although in certain circumstances lower interests of 10% or even 5% can trigger an approval requirement.
Investments are generally subject to a monetary safe harbour. For private foreign investors, the key monetary threshold for a non-sensitive Australian business is A$347 million (£169.7 million)2, while investors from specified treaty countries benefit from a higher threshold of A$1,498 million (£732.7 million) for most investments. However, there are no safe harbours for:
investments in certain sensitive sectors, such as media and various categories of Australian land;
national security businesses – this includes businesses that are involved or connected with a ‘critical infrastructure asset’, telecommunications carriers or nominated carriage service providers, defence or a national intelligence community or their respective supply chains. ‘Critical infrastructure’ asset is separately defined in the Security of Critical Infrastructure Act 2018 (Cth) and at a high level includes certain assets in the following sectors, among others: energy (including electricity, gas and energy market operators), liquid fuel, water and sewerage, ports, telecommunications, healthcare, freight infrastructure and services, public transport and data storage or processing; and
foreign government investors (FGIs) – the FGI definition is broad, capturing not only state-owned enterprises and sovereign wealth funds but also entities like public sector pension funds, public universities, the investment funds into which state-owned enterprises, sovereign wealth funds, public sector pension funds and public universities invest and, due to tracing rules, portfolio companies for such investment funds.
Investors and transactions which involve a critical infrastructure asset should also expect higher levels of scrutiny, an increased chance of conditions imposed on approvals and longer processing times due to consultation with various partners in other government departments (e.g. the Department of Defence).
What is the latest public policy direction for merger control in this jurisdiction, particularly regarding any trends relevant for infrastructure investment?
Australia's merger control regime, overseen by the ACCC, has recently undergone its most significant reforms in 50 years, transitioning from a voluntary, judicial enforcement model to a mandatory, suspensory merger clearance regime which commenced on 1 January 2026.
Whereas notification was previously voluntary, acquisitions that meet certain thresholds and other requirements must now be notified to the ACCC. If a qualifying acquisition is not notified, the transaction will be considered void, and the parties may be liable to pay significant penalties.
Under the new regime, an acquisition must be notified, unless an exemption applies, where each of the following are satisfied:
it involves a person acquiring assets of a person or "control" (including deemed control) of an entity through a share sale. The concept of “control” is defined more broadly than in the EU Merger Regulation and will apply in any case where either a person is acquiring a majority stake, or a person (either alone or together with associates) is able to determine the outcome of decisions about the financial and operating policies of the company. In determining whether someone has that capacity, it is the practical influence they can exert (rather than the rights they can enforce) that will be the relevant deciding factor;
it meets the monetary thresholds or is subject to a specific ministerial designation (a legally binding instrument where a Minister exercises statutory power to set specific rules for specific entities or industries); and
the target is " connected" with Australia that is, it either “carries on business” in Australia or holds assets are used in an Australian business. This assessment is conducted on a case-by-case basis according to a range of factors.
Given their size, infrastructure acquisitions will frequently meet the following monetary thresholds:
Acquisitions resulting in larger corporate groups: the combined Australian gross revenue of the merged parties (including indirectly acquired and connected entities) is at least AUD $200m (£97.8m), and the target has a gross revenue of at least AUD $50m (£24.5m) or the transaction value is at least AUD $250m (£112.3m) in the case of shares or AUD $200m (£97.8m) in the case of discrete assets; or
Acquisitions by large corporate groups: the acquirer (including connected entities) has Australian gross revenue of at least AUD $500m (£244.5m), and the target has gross revenue of at least AUD $10m (£4.9m) for share acquisitions, or the transaction value is at least AUD $250m (£112.3m) in the case of shares or AUD $50m (£24.5m) in the case of discrete assets.
The regime also captures a broad range of real asset transactions. The definition of "assets" includes legal and equitable rights such as interests in land (including leases and licences) and plant and equipment, meaning that infrastructure deals involving such interests will be caught.
While the ACCC has not identified infrastructure transactions as a particular focus of the new regime, it has identified infrastructure in its 2026-27 enforcement and compliance priorities. This indicates a significant regulatory focus on promoting competition in essential services such as telecommunications, electricity, and gas, as well as competition and consumer issues in the aviation sector.
What is the record of sector-specific regulators overseeing infrastructure sectors in this jurisdiction and are there any key or upcoming developments to highlight?
Australian infrastructure regulation is overseen by a combination of general and sector-specific regulators across both national and state level. The ACCC oversees telecommunications and certain transport infrastructure, while state regulators govern assets such as urban water networks.
The energy sector has several dedicated market bodies including the Australian Energy Market Commission (AEMC), Australian Energy Regulator (AER) and Australian Energy Market Operator (AEMO):
AER: In the energy sector, the AER is generally viewed as providing regulatory stability and predictability. This is partly due to the rules administered by the AER being highly prescriptive, but is also attributed to its transparent and generally consistent decision-making. However, this consistency means the AER can adopt a conservative approach, occasionally demonstrating a reluctance to allow higher rates of return on investment or flexibility for regulated businesses.
AEMO: Playing a critical role alongside local network service providers, the AEMO is responsible for market operation, grid connection oversight, and identifying priority infrastructure projects. While AEMO’s processes are generally transparent and well-understood, they can be time-consuming and at times a source of delay and frustration for project proponents.
Outside the energy sector, the ACCC’s processes are similarly transparent and generally predictable. Until recently, the ACCC and AER have been integrated, with sharing of staff and other resources between the two organisations. This led to a high degree of consistency in regulatory methods between the AER and ACCC. These two organisations will formally separate on 1 July 2026. Despite this structural change, consistency in their regulatory approaches is expected to remain.
The experience with state-based regulators is notably more variable. Due to differing statutory functions and level of resourcing, the quality and timeliness of decision-making is less consistent for infrastructure that is regulated at the state level compared to national frameworks.
- Mandatory?
- Yes4
- Voluntary?
- No5
- Review period(s)
Once filing confirmed to be complete:
Phase 1: Up to 30 Business Days6
Phase 2: Up to 90 Business Days7
Public Benefit Phase (optional): Up to 50 Business Days8
Tribunal Review: Application within 14 calendar days of publication of ACCC reasons. Tribunal determination within 90 days, extendable by 60 days (once), or a further 90 days in complex cases.
- Number of notifications
- 72 notifications considered and 85 waivers granted9
- Non-notified deals called-in
- 0
- In-depth investigations
- 3 notifications in Phase 2
- Remedies cases
- None at date of preparing this response
- Blocked cases
- None
- Abandoned cases
- None
Endnotes
The main laws that regulate foreign investment in Australia are the Foreign Acquisitions and Takeovers Act 1975 (Cth) and the Foreign Acquisitions and Takeovers Regulation 2015 (Cth), which is administered by the Treasury and the Foreign Investments Review Board.↩︎
ECB exchange rate for the 2025 calendar year: £1 = A$2.0446. Monetary thresholds are for 2026.↩︎
The new mandatory merger control regime came into force on 1 January 2026. There are no available statistics before that date.↩︎
Mandatory notification required where: (i) acquisition involves a person acquiring assets or “control” of an entity through a share sale; AND (ii) the acquisition meets monetary thresholds or is subject to a specific ministerial designation; AND (iii) the target is “connected” with Australia.↩︎
The former voluntary regime has been replaced by the mandatory and suspensory regime.↩︎
Earliest approval at 15 Business Days. Time may be extended in certain circumstances. The ACCC expects ~80% of acquisitions to be approved within 15–20 Business Days.↩︎
Phase 2 review period commences immediately after Phase 1 and may be extended in certain circumstances.↩︎
Application must be lodged within 21 calendar days of ACCC's determination. May be extended in certain circumstances.↩︎
Average Phase 1 length: 18 Business Days and average waiver review period: ~12 Business Days.↩︎